Vitoria-Bilbao-San Sebastián High Speed Railway

About This Project

The project was 46 million usd for the design and construction of a platform almost two miles in length, three single-track viaducts, two double-track viaducts (Goikoa and Zumelegi), and an eight square mile artificial tunnel for the Zumelegi double track.

Category
Bridges, Rail